04 / Customer Economics & Cash
The Next $10M Comes With a Working-Capital Claim
Build the funding plan around the next orders, the terms they carry and the weeks when cash leaves ahead of receipts.
The example below is illustrative.
Give the growth plan a cash profile
A board has approved a $10 million revenue target. Before Sales can commit the first large orders, the CEO has to decide whether to authorize inventory purchases, change the mix of orders or arrange additional credit. The budget shows the same contribution whichever quarter the new work lands. The bank balance follows the order in which materials are paid for, inventory is held and customers pay. Compare three $50 million businesses adding the same $10 million: one sells in short batches with deposits, one carries stock and offers standard terms, and one buys long-lead materials before it can bill for installation. The target is shared. The cash each board has to commit is different.
Translate the next orders into terms and timing before applying a historical balance-sheet ratio. Determine what must be financed in advance, what suppliers will finance, what can be billed and when cash can be collected. Build the model from the incremental mix. A company adding more of a high-inventory line can change the economics even if its consolidated receivable days barely move.
Estimate a steady-state claim
Take $10 million annual incremental revenue and $7 million annual incremental delivery cost. Use revenue for receivables, relevant cost for inventory, and eligible supplier purchases for payables. Here eligible purchases are $5 million annually, less than the $7 million cost base because payroll is not supplier credit. Estimates use 365-day equivalent balances, with average customer deposits held shown separately. Assume deposits in the table relate to unfulfilled obligations distinct from the receivables balances shown.
| Incremental business design | Receivables | Inventory and work funded at cost | Supplier credit | Customer deposits held | Modeled net increase |
|---|---|---|---|---|---|
| 30 receivable days, 25 inventory days, 40 supplier days | $0.82M | $0.48M | ($0.55M) | ($0.20M) | $0.55M |
| 50 receivable days, 45 inventory days, 35 supplier days | $1.37M | $0.86M | ($0.48M) | — | $1.75M |
| 65 receivable days, 80 inventory days, 25 supplier days | $1.78M | $1.53M | ($0.34M) | — | $2.97M |
Under these simplified assumptions, the third design calls for roughly $2.42 million more steady-state funding than the first. Calculate pre-billing cash explicitly where the work has a long acceptance stage. If the cost balance for finished unbilled work is already captured in work in progress, avoid adding the same cost twice. The pre-invoice delay analysis uses value-weighted billing dates to find the gate. Here the objective is to forecast actual funds needed.
Stress the peak, not just the average
The middle design can still have the worst week. Suppose it builds $1.1 million of incremental inventory before orders mature, has $500,000 of billed-but-uncollected receivables and has only $250,000 of supplier credit outstanding. Its point-in-time working-capital position is $1.35 million. Six weeks later inventory stands at $900,000, receivables at $1.8 million and payables at $350,000. The requirement reaches $2.35 million. The $1.75 million steady-state average misses both the timing and $600,000 of the measured peak in this scenario.
A customer acceptance slip does not always pile on to an existing receivable peak. Some work remains unbilled while some invoices continue to clear. Model named shocks on the calendar: delay the cash receipt of specific orders, bring a material deposit forward, or extend payment of a supplier whose terms allow it. Then calculate the worst simultaneous draw on the cash forecast. Capital expenditure, onboarding, debt service and taxes belong in the cash forecast as separate lines. Do not present them as trade working capital.
The plan also needs a trigger before the first substantial commitment, when the company can still change terms. Suppose a planned $700,000 material release follows an expected $400,000 installment. If the installment moves back one week and the release date holds, the cash forecast needs to show the extra $400,000 exposure during that week, along with the company’s other calls on cash. Stress the same dates under cancellation or slower sales. Deferred payment of an invoice the company already owes is feasible only if the supplier will actually accept it.
Choose how to fund the next order
A model can show growth that releases cash, for example a standardized prepaid service with little upfront buying. Check refunds and payment timing and obligations still owed. If the cash arrives before the work, consider when the company will spend it to keep the promise. Another plan may require a funding step that is perfectly commercial if returns, risk and liquidity all clear the company’s thresholds. The choice is among designs as well as lenders: supplier terms, qualifying orders earlier, smaller minimum batches, deposits, customer rights, and start dates can all shift the peak.
Test a decision with a dated trigger. If a customer accepts a deposit only once the first site is confirmed, release the long-lead order after that trigger or make the risk an explicit approval. If an order cannot be delayed without losing the work, make the timing choice rather than assuming a facility will arrive in time.
Bring a 13-week bridge to the approval
Build a dated cash curve for the largest orders across the first 13 weeks, and extend the forecast through the highest-risk procurement and collection periods if longer. Identify the largest point-in-time draw, the date when financing is required and the first condition that would invalidate the approved sequence. Assign Sales, Operations and Treasury individual dates and evidence for their assumptions. Reconcile the model to actual vendor payments and customer receipts after the first month, then rerun it before committing the next block of growth.
Take this to your team. On the week growth draws the most cash, which assumption must hold for the company to fund what it has promised?